Cities and the Sky By Italo Calvino

Those who arrive at Thekla can see little of the city, beyond the plank fences, the sackcloth screens, the scaffoldings, the metal armatures, the wooden catwalks hanging from ropes or supported by sawhorses, the ladders, the trestles. If you ask "Why is Thekla's construction taking such a long time?" the inhabitants continue hoisting sacks, lowering leaded strings, moving long brushes up and down, as they answer "So that it's destruction cannot begin." And if asked whether they fear that, once the scaffoldings are removed, the city may begin to crumble and fall to pieces, they add hastily, in a whisper, "Not only the city."

If, dissatisfied with the answers, someone puts his eye to a crack in a fence, he sees cranes pulling up other cranes, scaffoldings that embrace other scaffoldings, beams that prop up other beams. "What meaning does your construction have?" he asks. "What is the aim of a city under construction unless it is a city? Where is the plan you are following, the blueprint?" "We will show it to you as soon as the working day is over; we cannot interrupt our work now," they answer.

Work stops at sunset. Darkness falls over the building site. The sky is filled with stars. "There is the blueprint," they say.

About Me

Sky-rise Cities is a competition run by the University of Auckland School of Architecture which requires groups of 2 or 3 to build a skyrise with a minimum height of 8 meters. We previously had a space of 2.5m by 2.5m to build in but this has been reduced to 2m by 2m. The structure must be self supporting and can not be propped up, hung or supported by another structure. Our brief was to find a story and convey our interpretation of that story through a structure.Our idea for the Skyrise Cities project is based on the story "Cities and the Sky" by Italo Calvino.

Saturday, September 25, 2010

Progress

Over the past week we have been trying our best to collect all the bamboo we need. We spent two days (Wednesday and Friday) cutting down bamboo and we now have everything. We have also started to cut our bamboo to size and have started painting it. This will take quite a while but once all the pieces are cut and painted black we will assemble the structure. This may only take a day per module. There are 4 large modules and one smaller module. This may take half a day. We are in the process of ordering our glowsticks. We have three weeks until the exhibition.We have many late nights ahead of us.

Monday, September 20, 2010

Cutting Bamboo

We were very lucky as it was a beautiful sunny day when we went to cut down our bamboo from Sonya's garden.  We were lucky in that we were able to take as much as we wanted. So far we have spent two days cutting down bamboo and will possible need one more day to cut more down. We had to trim and cut the bamboo into shorter pieces and we also started to sand the bamboo.


Last week we began experimenting further with how we could connect the bamboo. We think a connection like this would make the structure much stronger and would decrease the amount of space the bamboo would take up (as when you bind the bamboo you double the space the bamboo takes up as the bamboo overlaps). We think this would be good for the outer structure as this will be the supporting structure and will need to be strong.

We also started to bind around the connection. This will give the strcuture a more beautiful sense of detail. It will also give the bamboo more strength around the diameter and stop it from splitting. Though in our final structure the bamboo will be black!

Sunday, September 12, 2010

Binding the bamboo for the Prototype.

Below are some photographs of binding techniques that we have tried out.

Philipino Lashing

Japanese Square Lashing

Combination of Japanese and Philipino Lashing


Saturday, September 11, 2010

Sanding the Bamboo.

This week we managed to acquire free Bamboo from a lovely lady called Sonia. Over the last few days we have been busily sanding down the entire lot of bamboo so that we can spray them black.



Friday, September 10, 2010

Problems we have encountered.

Last week we managed to aquire some bamboo to use for our prototype. we painted it with black acryllic paint over the weekend, but we found that the paint just chipped off the surface of the bamboo when it dried!
We had to sand all of the paint off and further sand down the bamboo to remove the smoothe surface of the bamboo. Luckily the second time we applied the paint onto the bamboo it did not chip off!

Without the surface sanded down.


After sanding!



We also experimented binding the bamboo pieces together which worked really well. We have had a few problems however where the horizontal bamboo pieces are slipping so we are going to have to put our heads together and figure out a way of preventing the slipping.

Sunday, September 5, 2010

Thinking About Binding

We are looking at different types of lashing. The trippod lashing may work for the corners of the glowstick boxes and the bamboo boxes.


Tripod Lashing

Diagonal Lashing

Japanese Box Lashing

Friday, September 3, 2010

Materials and Development

Today we found a suitable mesh material that could possibly be used for our final structure. We have also found bamboo and a suitable twine to bind our bamboo with. We have a large quantity of glowsticks that we can use for our prototype! We have been developing our structure and have designed it to be more modular making it easier for us to construct on the day. We are planning to have about five modules of our bamboo structure that can slot together easily and quickly.


We have also reconsidered the idea of using a pully system. The ropes may slip off the pullys and if the pullys are 8m high then it will be impossible for us to fix it if this were to happen on the night. We have decided to use rings instead. We will thread the rope through the ring and the rope will have no chance of slipping out. We are currently looking into binding.

Developing Our Measurements